Maintenance & Paving

The City of Brownsville has over 700 miles of roadway infrastructure which the Street Division keep clean, safe, and well-maintained for the convenience and safety of the public. Despite rain delays, 11.05 miles of road were constructed along with alley repairs. These projects included materials needed for curb and gutter work, and sidewalk construction. More work has yet to be done.

Additional Work Included:
  • 21 Miles of Crack Sealing
  • 43,950 Linear Feet of Sidewalk Construction
  • 534 Miles of Street Sweeping
  • 55 Miles of Asphalt Rejuvenation
  • Covering 420,000 Square Foot Of Potholes
  • Reparation of 160,000 Square Foot Of Pub Utility Cuts